Your Cart 3 items
  1. All Round Set
    1 x $845
  2. Rent a tractor
    $125 per/week
Subtotal : $1559

Camden
FRA works Programme

Plan and Details

Project Type Residential and Communal Properties.
Client London Borough of Camden
Date November 2024 - Ongoing
Value £300k

Scope

Fire Stopping Works; Fire Door Upgrades; New FD30 Communal & Residential Fire Doors.

Project Description

DCK Construction was appointed by the London Borough of Camden to undertake essential Fire Risk Assessment (FRA) works across scattered residential and communal properties.

The project involves conducting FRA surveys, implementing fire-stopping measures, upgrading fire doors, and installing new FD30 communal and residential fire doors. Given the nature of the work, ensuring compliance with stringent fire safety regulations is a key priority.

With a diverse range of properties requiring attention, DCK has had to navigate logistical challenges, including coordinating work across multiple locations and managing resident engagement. The project also involves close collaboration with the client to ensure work is completed efficiently while maintaining transparency through structured reporting.

Challenges & Solution

Managing Previously Incorrect FRA Works DCK encountered incorrect FRA works completed by others, posing safety risks. Our BM Trada-certified FRA Surveyor conducted inspections and provided detailed reports for corrective action, ensuring regulatory compliance.

Gaining Access to Residential Properties Securing access to occupied properties was challenging. DCK’s Resident Liaison Officer and Site Manager implemented a structured three-letter process, improving engagement, scheduling surveys, and minimising disruption.

Coordinating Scattered Property Works With properties spread across Camden, DCK optimised efficiency by grouping work into locations, reducing labour costs. The DCK Viewpoint System and the client’s Microsoft 365 platform ensured seamless data management and documentation.

Outcomes & Progress

More than 100 FRA actions were completed within the month, with ongoing work to address further actions efficiently.

Increased efficiency through strategic work grouping, reducing downtime and labour costs.

BM Trada certification is provided for each completed work item, ensuring compliance with fire safety regulations.

Improved resident engagement through structured communication, minimising disruptions and enhancing cooperation.

Streamlined reporting and documentation via digital platforms, ensuring all data is accessible and up to date.

Faster project turnaround times through careful scheduling and coordination, reducing lead times for new door installations.

Enhanced fire safety across properties by rectifying previous FRA deficiencies, ensuring residents and communal areas meet required safety standards.

DCK remains committed to delivering high-quality FRA works for our client, ensuring safety and compliance in Camden’s residential and communal properties.

Associations and Accreditations

or

For faster login or register use your social account.

Connect with Facebook